Research on Real-time Control of Construction Progress
Author(s) -
Gang Li,
Peng Zhao,
Shili Sun
Publication year - 2019
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/376/1/012010
Subject(s) - plan (archaeology) , schedule , key (lock) , control (management) , process (computing) , work schedule , excavation , operations research , computer science , operations management , engineering , work (physics) , mechanical engineering , operating system , history , artificial intelligence , geotechnical engineering , archaeology
combining with the chilong river management project, this paper analyzes the factors that affect the progress and the related methods of the progress control. By compiling the network plan, the free time difference and the total time difference in the construction process are analyzed and calculated. It is determined that the key work of construction is Xiaobo pump station, and the key route is Xiaobo pump station excavation-Xiaobo pump station concrete pouring-Xiaobo pump station backfill, and the construction progress is further optimized and analyzed, and the purpose of shortening the construction period is achieved. It is verified that the reasonable arrangement of construction schedule can achieve the purpose of shortening the construction period without increasing the additional cost.