z-logo
open-access-imgOpen Access
Construction Time-Cost Optimization of River Dredging Project in Cold Region Based on NSGA-II Algorithm
Author(s) -
Xinbin Feng
Publication year - 2019
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.179
H-Index - 26
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/371/2/022032
Subject(s) - dredging , investment (military) , computer science , matlab , software , optimization algorithm , operations research , industrial engineering , engineering , systems engineering , mathematical optimization , oceanography , mathematics , politics , political science , law , programming language , operating system , geology
The construction of water conservancy projects is increasingly restricted by non-technical factors such as climate, environment and society, so it is particularly important to optimize it to improve the benefits of construction enterprises. Taking a river dredging project in cold region as an example, this paper uses NSGA-II algorithm to carry out multi-objective optimization of the construction time-cost, and uses MATLAB software to compile the construction optimization program of dredging project. Finally, the optimal combination of construction time and cost is obtained. The results show that the optimization results are in line with the actual situation of the project and save about 10% of the investment for the project. The method in this paper can provide useful reference for the optimization control of the construction progress of the actual project.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here