z-logo
open-access-imgOpen Access
Formation of bridge end bumps due to settlement at bridge approaches
Author(s) -
M. Aziman,
M. R. Raizal Saifulnaz,
Farzad Hejazi,
Arash Azarkerdar
Publication year - 2019
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.179
H-Index - 26
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/357/1/012013
Subject(s) - bridge (graph theory) , settlement (finance) , abutment , levee , foundation (evidence) , engineering , civil engineering , forensic engineering , geotechnical engineering , computer science , political science , law , medicine , payment , world wide web
The problem of bridge bump has been a major issue for decades. Over the years, a lot of studies have been conducted by various agencies and professionals to investigate and pinpoint the cause of this phenomenon. Majority of researchers agreed that the major cause of the formation of bridge bump is the differential settlement of soil between bridge abutment and bridge approach. However the exact cause of the settlement may vary depending on the site condition. Some of the causes of settlement were discussed in this paper which includes deformation of embankment fill, deformation of foundation soil, poor drainage system in and around the bridge abutment and poor design and construction practices. Besides that, current practices and new development of mitigation and rehabilitation methods were also discussed in this paper. This paper reviews the factors that contribute to the formation of bridge bump while also identifying the available methods that was used to eradicate this problem.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here