Quality Inspection and Evaluation of Lining of Flood Discharge Tunnel in Nam Lik 1-2 Power Station
Author(s) -
Meng Li,
Heran Wang,
Ming Feng,
Xiulin Li
Publication year - 2019
Publication title -
iop conference series. earth and environmental science
Language(s) - English
Resource type - Journals
eISSN - 1755-1307
pISSN - 1755-1315
DOI - 10.1088/1755-1315/304/3/032052
Subject(s) - flood myth , hydrology (agriculture) , environmental science , geotechnical engineering , forensic engineering , geology , engineering , geography , archaeology
In 2015, Laos Nam Lik 1-2 power station once dealt with the defect of the flood discharge tunnel. After the flood discharge hole was emptied in 2018, it was found that the concrete was peeled off and exposed. After on-site census, radar detection, rebound and core strength testing, it is judged that the tunnel has apparent defects but does not affect the flood season operation. In order to prevent the surface concrete from being washed by the water flow and continue to expand the shedding surface, it can be repaired and strengthened after the flood season, which provides a favorable scientific basis for the operator.