z-logo
open-access-imgOpen Access
Coordinated operation method of cascade hydropower stations considering runoff error
Author(s) -
Miao You,
HU Kong-fei
Publication year - 2022
Publication title -
journal of physics. conference series
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.21
H-Index - 85
eISSN - 1742-6596
pISSN - 1742-6588
DOI - 10.1088/1742-6596/2195/1/012016
Subject(s) - hydropower , cascade , surface runoff , scheduling (production processes) , environmental science , computer science , engineering , operations management , ecology , chemical engineering , electrical engineering , biology
The traditional collaborative scheduling method of cascade hydropower stations group has the problem of imperfect regression model, which leads to excessive water consumption rate. A collaborative scheduling method of cascade hydropower stations group considering runoff error is designed. The influence factors of runoff forecast were obtained, the network parameters were called, and the regression model was built based on the runoff error according to the total power generation of cascade hydropower stations in the degree period. The objective function of hydropower system with hydropower stations as the center was established to optimize the cooperative dispatching mode. Experimental results: The average water consumption rates of the coordinated operation method of cascade hydropower stations group in this paper and the other two kinds of coordinated operation method of cascade hydropower stations group are 34.86%, 57.26% and 59.47% respectively, indicating that the coordinated operation method of cascade hydropower stations group with runoff error is more perfect.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here