z-logo
open-access-imgOpen Access
Advantages of Using Hybrid System Method in Industrialised Building System (IBS)
Author(s) -
Izzati Azmin,
Umar Kassim
Publication year - 2021
Publication title -
journal of physics. conference series
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.21
H-Index - 85
eISSN - 1742-6596
pISSN - 1742-6588
DOI - 10.1088/1742-6596/2129/1/012061
Subject(s) - precast concrete , hybrid system , component (thermodynamics) , process (computing) , engineering , control (management) , government (linguistics) , civil engineering , computer science , construction engineering , artificial intelligence , linguistics , philosophy , physics , machine learning , thermodynamics , operating system
Hybrid System method is one of the technology implements in Industrialised Building System (IBS). Methods has been acquaint in many ways in order to improve Industrialised Building System (IBS) in Malaysia. Other country such as United Kingdom also have used the term Hybrid for their concrete process known as Hybrid Concrete Construction (HCC). While in Malaysia, Hybrid System comes with a method that combines one component with two different method which are the precast component and cast-in situ method. This two combination method has called a Hybrid System method and started implements by Jabatan Kerja Raya (JKR) for mostly a government projects in Kedah state in Malaysia on 2017. Industrialised Building System has been well known as a fast completion, saving cost, and less labour needed in construction. However, the issues by using Hybrid System method has double up the time completion, splurging the cost, and enlarge the labour since it needs to cast-in situ the components, let the concrete cured and more material usage. The significance of study for this research is the new method of IBS Hybrid System is a pilot project in Kedah by JKR. Thus, this research is to control the delay involves in projects that apply IBS Hybrid System. Hence, this paper is to identify the advantages of using Hybrid System method in Industrialised Building System (IBS).

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here