Study on safety management of guy wires in the construction of UHV (EHV) transmission lines
Author(s) -
Jianjun Fang,
Hou Ji-yong,
Dai Chenghao
Publication year - 2021
Publication title -
journal of physics. conference series
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.21
H-Index - 85
eISSN - 1742-6596
pISSN - 1742-6588
DOI - 10.1088/1742-6596/2005/1/012244
Subject(s) - key (lock) , electric power transmission , tower , engineering , plan (archaeology) , transmission line , electrical engineering , forensic engineering , computer science , computer security , civil engineering , history , archaeology
The guy wires play an important and key role in the erection of the tower. Temporary guy wires are also used extensively in the stringing engineer. This study summarizes the causes of many serious accidents caused by temporary guy wires that do not meet the requirements of use and operation. It focuses on the high-risk links in the guy wire operation, from the calculation and verification before the use of the guy wire, the construction technical plan, the control of key links, and the construction process. The implementation of management and control is analyzed and summarized, and the key monitoring links of safety management and control of guy wires are summarized. The study provides reference for the construction of other similar HUV (EHV) high voltage transmission lines.