z-logo
open-access-imgOpen Access
Cause analysis and preventive measures of 500kV shunt reactor bushing failure
Author(s) -
Yang Xiao,
Yuxiang Yang,
Gongliao Zhang,
Ribin Yao,
Lifan Lv
Publication year - 2021
Publication title -
journal of physics. conference series
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.21
H-Index - 85
eISSN - 1742-6596
pISSN - 1742-6588
DOI - 10.1088/1742-6596/1885/4/042061
Subject(s) - bushing , casing , shunt (medical) , engineering , forensic engineering , environmental science , petroleum engineering , mechanical engineering , medicine , surgery
In response to a recent 500kV line shunt reactor high-voltage bushing failure event in a station, This article examines and analyzes the objects and protection actions after the casing is disassembled. It was found that the cause of the casing failure was caused by the arc igniting the insulating oil in the casing after the main insulation of the casing was discharged. Finally, corresponding preventive measures are proposed from the perspective of on-site operation and maintenance.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here