
Evaluation of Total Armada Transport City Route 05B in Cianjur City
Author(s) -
Devi Setiawan
Publication year - 2021
Publication title -
journal of physics. conference series
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.21
H-Index - 85
eISSN - 1742-6596
pISSN - 1742-6588
DOI - 10.1088/1742-6596/1764/1/012150
Subject(s) - rush hour , trips architecture , transport engineering , officer , vehicle miles of travel , engineering , geography , morning , advertising , business , archaeology , medicine
The transportation problem is a classic problem that occurs in almost every city in Indonesia, including the city of Cianjur which is located in the province of West Java. One focus of transportation problems in the city of Cianjur is about the number of Cianjur city transportation that is too much operating but not balanced with the number of passengers served. This condition causes the city transportation drivers to fight over passengers to catch up with deposits. The method of conducting the research was carried out by a dynamic survey, carried out in a vehicle by the method of recording the number of passengers who boarded and alighted vehicles traveling on a route, where the officer recorded the number of passengers who boarded and descended and or travel time in each segment. After analyzing, the loading factor value for rush hour and rush hour turns out to be under 50%. The average number of fleets 05B needed to be based on circulation time (K) at morning rush hour 1 unit vehicle/hour, rush hour afternoon 2 units vehicles/hour, and during the afternoon no rush hour 1 unit of vehicle/hour. While the number of trips (fleet trips) needed in the busy period and non-busy time (K ’) in the morning rush hour 2 vehicle trips (trip) / hour, rush hour noon 2 Vehicle trip (trip) / hour and at no-rush hour afternoon 2 Vehicle trip (trip) / hour.