z-logo
open-access-imgOpen Access
Troubleshooting of a 330MW turbo generator unit during commissioning
Author(s) -
Lyuzhou Ma
Publication year - 2021
Publication title -
journal of physics. conference series
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.21
H-Index - 85
eISSN - 1742-6596
pISSN - 1742-6588
DOI - 10.1088/1742-6596/1748/5/052051
Subject(s) - turbo generator , troubleshooting , project commissioning , fault (geology) , vibration , engineering , generator (circuit theory) , turbo , condenser (optics) , unit (ring theory) , structural engineering , bearing (navigation) , automotive engineering , reliability engineering , computer science , mechanical engineering , power (physics) , acoustics , physics , law , optics , quantum mechanics , political science , light source , publishing , seismology , geology , mathematics , artificial intelligence , mathematics education
During the commissioning stage of a 330MW turbo generator unit, several serious defects occurred, such as low vacuum of condenser, abnormal vibration of shafting and bearing damage. Through fault analysis and vibration test, the hidden danger in design, manufacture and installation were found out and solved, the unit successfully completed 168 hours full load test run and put into operation.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here