z-logo
open-access-imgOpen Access
Research And Practice Of 600MW Subcritical Steam Turbine Inter Generation Upgrading
Author(s) -
Jin Shengxiang,
Wang Liuhu,
Jinsong Zhang,
Qi Zhang,
li Qianyu,
Bai Wei,
He Chuan,
Zhou Yong,
li Daming,
Xiaohu Yu
Publication year - 2020
Publication title -
journal of physics. conference series
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.21
H-Index - 85
eISSN - 1742-6596
pISSN - 1742-6588
DOI - 10.1088/1742-6596/1654/1/012016
Subject(s) - steam turbine , turbine , steam electric power station , combined cycle , thermal power station , engineering , heat recovery steam generator , process engineering , nuclear engineering , mechanical engineering , waste management
This paper introduces the upgrading technical scheme and application of subcritical 600 MW steam turbine. Firstly, the performance and existing problems of 600 MW subcritical unit before modification are analyzed, and the performance and output of steam turbine before modification are determined. Secondly, the performance of 300MW subcritical steam turbine retrofit and the performance guarantee value of each retrofit manufacturer are studied, and the thermal calculation is carried out. At the same time, the performance index of subcritical 600 MW steam turbine after upgrading is analyzed. Finally, according to the channel reconstruction scheme provided by the manufacturer, the optimization design of cold end optimization, last stage blade selection and base foundation reconstruction is proposed.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here