3δ principle and boxplot method are used to estimate the cost interval of tower replacement technology
Author(s) -
Jianqing Li,
Xiaohu Zhu,
Chen Zhao,
Jian Kang
Publication year - 2020
Publication title -
journal of physics. conference series
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.21
H-Index - 85
eISSN - 1742-6596
pISSN - 1742-6588
DOI - 10.1088/1742-6596/1570/1/012041
Subject(s) - tower , grid , unit cost , range (aeronautics) , interval (graph theory) , computer science , rationality , unit (ring theory) , reliability engineering , power grid , operations research , industrial engineering , power (physics) , engineering , mathematics , civil engineering , mechanical engineering , geometry , mathematics education , physics , combinatorics , quantum mechanics , political science , law , aerospace engineering
The replacement of tower is an important part of the technical reform of power grid lines. To analyze the rationality of the cost of the technical reform of tower, it is necessary to deal with the abnormal engineering data based on the cost data of previous projects. In this paper, the unit cost of tower replacement is sorted out by using 3δ principle and boxplot method, and the reasonable cost range is obtained to provide a basis for project investment.