Optimization of Two-Component Nuclear Power System
Author(s) -
E.V. Muraviev
Publication year - 2020
Publication title -
journal of physics. conference series
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.21
H-Index - 85
eISSN - 1742-6596
pISSN - 1742-6588
DOI - 10.1088/1742-6596/1475/1/012003
Subject(s) - nuclear decommissioning , component (thermodynamics) , nuclear power , nuclear engineering , project commissioning , reliability engineering , environmental science , nuclear power plant , computer science , systems engineering , engineering , nuclear physics , physics , waste management , political science , publishing , thermodynamics , law
System study results are presented that demonstrate the feasibility of Russian nuclear power attaining 120 GW(e) level by the century end, taking into account decommissioning of older NPPs that complete their operation life, and assuming the new NPPs commissioning rate of 4-6 power units per 5 years until the year of 2050 and up to 10 units per 5 years in the second half of the century. The possibility of complete nuclear power transition through the stage of two-component structure towards the new technological platform with naturally safe fast neutron reactors domination has been confirmed. No limitations related either to the national uranium resources or to the enrichment capabilities have been revealed.