z-logo
open-access-imgOpen Access
Workload measurement of batik workers at UKM batik jumputan Yogyakarta using RULA and NASA-TLX
Author(s) -
Retno Widiastuti,
Emmy Nurhayati,
Diah Pramudiya Wardani,
Edhy Sutanta
Publication year - 2020
Publication title -
journal of physics. conference series
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.21
H-Index - 85
eISSN - 1742-6596
pISSN - 1742-6588
DOI - 10.1088/1742-6596/1456/1/012032
Subject(s) - workload , work (physics) , task (project management) , operations management , engineering , computer science , mechanical engineering , operating system , systems engineering
A workload that exceeds the ability of workers or vice versa can cause a problem for workers. In this paper, we present a measurement of the physical and mental workload of workers at UKM Batik Jumputan Ibu Sejahtera Yogyakarta, and it has a purpose to find problems that occur so that recommendation for further improvement and problem-solving can be proposed. The physical workload measured by using RULA (Rapid Upper Limb Assessment) method, while the mental workload is measured by using NASA-TLX (NASA Task Load Index ). This study succeeded in revealing the problems occur on workers such as there are differences in the level of worker risk which is caused by differences in age and differences in worker perceptions towards the dimensions of workload, and some workers experience high or very high levels of risk which is caused by improper work postures. Recommendations that can be done to solve the case are adding or replacing workers, increasing the workability of workers, adding work aids, changing work methods, and increasing workers’ understanding so that they can fill out questionnaires accurately.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here