z-logo
open-access-imgOpen Access
Maloperation Analysis and Preventive Measures of 500 kV Reactor Protection
Author(s) -
Haisheng Li,
Xiaoguang Yang,
Yang Shaoyuan
Publication year - 2020
Publication title -
journal of physics. conference series
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.21
H-Index - 85
eISSN - 1742-6596
pISSN - 1742-6588
DOI - 10.1088/1742-6596/1449/1/012048
Subject(s) - casing , reliability engineering , voltage , electrical engineering , engineering , computer science , mechanical engineering
This paper introduces the process of checking, analyzing and dealing with the causes of maloperation of the first set protection of 500 kV reactor in a substation. By checking the secondary circuit of 500 kV reactor protection for power outage, it is analyzed that the main cause of reactor protection malfunction is that the cable core of the current circuit of the first set protection is damaged at the secondary terminal box of TA of the high voltage casing pipes, which causes the induction current to enter in series, the abnormal sampling of the first set of protection B phase, and the protection outlet action. Aiming at the existing problems, this paper gives corresponding treatment methods and preventive measures.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here