Fuzzy project planning and scheduling using critical path techique
Author(s) -
T. Leelavathy,
S. Padmadevi
Publication year - 2019
Publication title -
journal of physics. conference series
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.21
H-Index - 85
eISSN - 1742-6596
pISSN - 1742-6588
DOI - 10.1088/1742-6596/1377/1/012044
Subject(s) - critical path method , fuzzy logic , duration (music) , computer science , fuzzy number , ranking (information retrieval) , scheduling (production processes) , path (computing) , fuzzy set operations , operations research , mathematical optimization , artificial intelligence , mathematics , fuzzy set , engineering , systems engineering , art , literature , programming language
In this article, we intend to determine the total duration of completion of the project for fuzzy networking problem with the activity duration represented as trapezoidal fuzzy number using Critical Path technique. A new fuzzy arithmetic operation, ranking method and a precise step by step plan is designed to obtain the total fuzzy duration, utilizing the available resources. Finally the proposed study is discussed with a numerical example.