Optimization of construction parameters using resource scheduling
Author(s) -
Marat Kuzhin,
Marina Akimockina
Publication year - 2019
Publication title -
e3s web of conferences
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.203
H-Index - 22
eISSN - 2555-0403
pISSN - 2267-1242
DOI - 10.1051/e3sconf/20199706030
Subject(s) - scheduling (production processes) , computer science , graphics , resource (disambiguation) , production (economics) , industrial engineering , operations research , operations management , engineering , computer network , computer graphics (images) , economics , macroeconomics
Reducing the time of production within maintaining the cost of the final product is the main issue in construction organization. This question can be resolved through the development of network and calendar schedules with the correct sequence of work, composition of brigades, optimal technological decisions. The successful correction of schedules is possible by calculating parameters of resource graphics and comparing them with the normal indicators. The effectiveness of the applied methods of optimization by the time and resources depends on technological and organizational parameters of the designed building or construction.