z-logo
Premium
Cover Picture: Steel Construction 1/2020
Publication year - 2020
Publication title -
steel construction
Language(s) - English
Resource type - Reports
SCImago Journal Rank - 0.443
H-Index - 8
eISSN - 1867-0539
pISSN - 1867-0520
DOI - 10.1002/stco.202070101
Subject(s) - rope , bridge (graph theory) , tension (geology) , cover (algebra) , engineering , structural engineering , forensic engineering , materials science , mechanical engineering , composite material , compression (physics) , medicine
For Schorgast Bridge Full Locked Coil Rope high strength tension components have been designed and implemented as stay cables. As part of the revision of EN 1993‐1‐11 the fatigue design rules for tension components have been modified and adjusted. An article in this edition provides insight and background information (Annan, R. et al., pp. 61–75) © FATZER AG

This content is not available in your region!

Continue researching here.

Having issues? You can contact us here