Premium
Cover Picture: Steel Construction 1/2012
Publication year - 2012
Publication title -
steel construction
Language(s) - English
Resource type - Reports
SCImago Journal Rank - 0.443
H-Index - 8
eISSN - 1867-0539
pISSN - 1867-0520
DOI - 10.1002/stco.201290006
Subject(s) - pylon , bridge (graph theory) , cover (algebra) , span (engineering) , cantilever , structural engineering , pearl , engineering , yangtze river , key (lock) , civil engineering , china , geography , computer science , archaeology , mechanical engineering , medicine , computer security
The Huangpu Pearl River Bridge is the key project on the second ring highway of Guangzhou, China. The main bridge over the northern channel is a single‐pylon cable‐stayed bridge with a main span of 383 m and a steel box girder, which was constructed using the balanced cantilever method (see p. 53).
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom