Risk assessment of a new high speed railway
Author(s) -
Leighton C. L.,
Dennis C. R.
Publication year - 1995
Publication title -
quality and reliability engineering international
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.913
H-Index - 62
eISSN - 1099-1638
pISSN - 0748-8017
DOI - 10.1002/qre.4680110609
Subject(s) - fault tree analysis , event (particle physics) , risk assessment , computer science , channel (broadcasting) , stage (stratigraphy) , operations research , engineering , risk analysis (engineering) , reliability engineering , business , computer security , telecommunications , paleontology , physics , quantum mechanics , biology
A quantitative risk assessment has been carried out by W. S. Atkins Ltd. and Kennedy and Donkin Transportation Ltd. for the conceptual stage of the proposed Channel Tunnel Rail Link. The assessment is one of the first for a railway system. It includes an integrated computer model. The whole risk model for the CTRL from base event data, through fault and event trees, to individual, collective and societal risks is processed using Lotus 1‐2‐3 spreadsheets. Variations to the design and operational assumptions and to the input data can be introduced into the model and the effect on risk calculated rapidly. This versatility is particularly useful because of the early stage of the project. It can be used to assist designers in consideration of possible design changes.