z-logo
Premium
Optimally scheduling interfering and non‐interfering cranes
Author(s) -
Emde Simon
Publication year - 2017
Publication title -
naval research logistics (nrl)
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.665
H-Index - 68
eISSN - 1520-6750
pISSN - 0894-069X
DOI - 10.1002/nav.21768
Subject(s) - scheduling (production processes) , computer science , mathematical optimization , job shop scheduling , yard , stack (abstract data type) , benders' decomposition , operations research , distributed computing , mathematics , computer network , operating system , physics , routing (electronic design automation) , quantum mechanics
Abstract This article treats the problem of scheduling multiple cranes processing jobs along a line, where cranes are divided into different groups and only cranes in the same group can interfere with each other. Such crane scheduling problems occur, for example, at indented berths or in container yards where double rail‐mounted gantry cranes stack containers such that cranes of the same size can interfere with each other but small cranes can pass underneath larger ones. We propose a novel algorithm based on Benders decomposition to solve this problem to optimality. In a computational study, it is shown that this algorithm solves small and medium‐sized instances and even many large instances within a few seconds or minutes. Moreover, it improves several best known solutions from the literature with regard to the simpler problem version with only one crane group. We also look into whether investment in more complicated crane configurations with multiple crane groups is actually worthwhile.

This content is not available in your region!

Continue researching here.

Having issues? You can contact us here