z-logo
Premium
Experimental analysis of reservoir release wave routing in upland boulder bed rivers
Author(s) -
Gilvear D. J.
Publication year - 1989
Publication title -
hydrological processes
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 1.222
H-Index - 161
eISSN - 1099-1085
pISSN - 0885-6087
DOI - 10.1002/hyp.3360030306
Subject(s) - attenuation , channel (broadcasting) , hydrology (agriculture) , geology , routing (electronic design automation) , hydraulics , front (military) , streams , geomorphology , geotechnical engineering , oceanography , engineering , computer network , physics , electrical engineering , aerospace engineering , computer science , optics
Reservoir release wave routing during 33 controlled reservoir releases, along 15 upland boulder bed river channel reaches, on five different regulated rivers were monitored to assess the importance of river channel roughness and reservoir release magnitude on reservoir release wave speeds. Wave speeds varied between 0.52 and 3.01 m s −1 . Reservoir release wave translation, steepening, and attenuation occurred. With high channel roughness values reservoir release wave arrival speed is retarded in comparison to peak stage and wave steepening occurs, but with a reduction in channel roughness reservoir release wave front arrival is accelerated producing attentuation. The threshold between reservoir release wave front attenuation and steepening occurs at a pre‐release discharge/channel width of approximately 0.1, an index of channel roughness. The paper also demonstrates, via comparison of observed and calculated reservoir release wave speeds on the River Washburn, Yorkshire, the difficulty of accurately predicting flood wave movement in upland boulder bed channels using existing prediction equations. The calculated values, however, revealed systematic error with pre‐release discharge and reservoir release magnitude. Apparently the equations fail to account for the effects of high channel roughness together with pressure gradient forces, induced by rapid rates of stage change on the rising limb of reservoir releases. In order to accurately predict reservoir release wave movement in regulated rivers, this paper demonstrates that hydraulic studies need to be undertaken and pre‐release discharges prescribed to determine desired reservoir release wave routing behaviour. Manipulation of the reservoir release pattern at the dam alone, cannot dictate reservoir release wave front form downstream or wave speed.

This content is not available in your region!

Continue researching here.

Having issues? You can contact us here