Premium
Cover Picture: Geomechanics and Tunnelling 1/2018
Publication year - 2018
Publication title -
geomechanics and tunnelling
Language(s) - English
Resource type - Reports
SCImago Journal Rank - 0.317
H-Index - 18
eISSN - 1865-7389
pISSN - 1865-7362
DOI - 10.1002/geot.201870101
Subject(s) - section (typography) , heading (navigation) , cover (algebra) , geology , quantum tunnelling , geotechnical engineering , drill , geomechanics , seismology , engineering , geodesy , computer science , materials science , mechanical engineering , optoelectronics , operating system
The St. Kanzian tunnel chain is located in the Mittlern‐Althofen section in the western part of the Koralm Railway and consists of six tunnels with lengths between 230 and 2,100 m, which are contructed using various methods. Except for a 565 m long cut and cover section, the Stein Tunnel with a total length of 2,100 m is being driven by drill and blast method. DSI Underground Austria delivers support elements to secure heading (see page 87).