Premium
The Grautschenhof contract – Construction of an intermediate access under complex local conditions
Author(s) -
Klais Frank,
Wolf Petra,
Lienhart Werner
Publication year - 2017
Publication title -
geomechanics and tunnelling
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.317
H-Index - 18
eISSN - 1865-7389
pISSN - 1865-7362
DOI - 10.1002/geot.201700052
Subject(s) - new austrian tunnelling method , engineering , humanities , art , excavation , geotechnical engineering
With the start of construction on the third tunnelling contract, work has now started on all sections of the Semmering Base Tunnel. The Tunnel Grautschenhof contract is a challenging construction project with numerous unusual problems. Complex ground conditions make extensive grouting necessary. Numerous constraints above‐ground, like high‐pressure gas pipelines require monitoring and protection measures. Since the start in May 2016, two shafts, the first of three caverns and the first metres of the running tunnels have already been driven. In parallel to this, the works above ground to create two site facilities areas are now largely complete.