Use of recycled material for segments and inner lining – first experience of on‐site processing on KAT 2 / Verwendung von Tunnelausbruchmaterial – von der TBM bis zum Tübbing, erste Erfahrungen mit der Materialaufbereitung vor Ort im Baulos KAT 2
Author(s) -
Huber Helmut,
Kratochwill Raimund,
Otto Richard
Publication year - 2013
Publication title -
geomechanics and tunnelling
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.317
H-Index - 18
eISSN - 1865-7389
pISSN - 1865-7362
DOI - 10.1002/geot.201310025
Subject(s) - geology , mineralogy , engineering , geotechnical engineering
In order to preserve the environment and save resources, Austrian Railways ÖBB have decided to recycle material excavated from contract KAT 2 of the 32.9 km long Koralm Tunnel and process it as aggregates for concrete production. This leads to a saving of gravel resources, reduction of transport routes and reduction of the required landfill areas. The rock mass, which is predominantly formed of schistose gneisses and gneisses with inclusions of mica schist, amphibolites and marbles, is being bored by tunnel boring machines. The material excavated from the tunnel is being recycled on site by processing for concrete aggregates. Die ÖBB haben sich aus umwelt‐ und ressourcenschonenden Aspekten beim Bau des 32,9 km langen Koralmtunnels im Baulos KAT 2 für die Verwendung des Tunnelausbruchs für die Aufbereitung von Gesteinskörnungen zur Betonherstellung entschieden. Dadurch ergibt sich eine Schonung der Kiesrohstoffe, Verringerung der Transportwege und Verkleinerung der erforderlichen Deponieflächen. Das Gebirge, vorwiegend aus Schiefergneisen und Gneisen mit Einschaltungen von Glimmerschiefern, Amphiboliten und Marmoren aufgebaut, wird mit Tunnelvortriebsmaschinen aufgefahren. Das anfallende Tunnelausbruchmaterial wird auf der Baustelle zu Betonzuschlagstoff aufbereitet.