z-logo
Premium
The safety equipment of the new line in the Lower Inn Valley / Die sicherheitstechnische Ausrüstung der Neubaustrecke im Unterinntal
Author(s) -
Saischek Michael
Publication year - 2012
Publication title -
geomechanics and tunnelling
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.317
H-Index - 18
eISSN - 1865-7389
pISSN - 1865-7362
DOI - 10.1002/geot.201200051
Subject(s) - risk analysis (engineering) , engineering , medicine
100 % safety is never achievable, even with unlimited resources. The basic principles of risk optimisation pose different efficiency. Therefore the risk and the extent of damage can be over‐proportionately reduced through very effective implementation of the basic principles. The article describes some measures for the minimisation of risk and their implementation on the Lower Inn Valley project as examples. Eine 100‐prozentige Sicherheit ist auch unter Einsatz unbegrenzter finanzieller Mittel nie erreichbar. Die Grundprinzipien der Risikominimierung sind unterschiedlich wirksam. Daher lassen sich durch Maßnahmen in den Grundprinzipien mit hoher Wirksamkeit das Risiko und das Schadensausmaß überproportional reduzieren. Der Beitrag beschreibt anhand von einigen Beispielen exemplarische Maßnahmen der Risikominimierung und deren Umsetzung im Unterinntalprojekt.

This content is not available in your region!

Continue researching here.

Having issues? You can contact us here