Premium
Tunnel San Fedele
Author(s) -
Fasani Martina,
Ammann Eduard,
Rüttimann Markus
Publication year - 2012
Publication title -
geomechanics and tunnelling
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.317
H-Index - 18
eISSN - 1865-7389
pISSN - 1865-7362
DOI - 10.1002/geot.201200011
Subject(s) - tunnel construction , excavation , engineering , physics , geotechnical engineering
The Roveredo bypass project will divert the national road A13 away from the village and includes three construction sections. The heart of the Roveredo bypass is the 2,391 m long two‐lane San Fedele Tunnel, which will carry traffic in both directions. Parallel to the tunnel, a safety tunnel is being constructed with an excavation diameter of 4 m. This will be linked to the tunnel every 300 m. Das Projekt Umfahrung Roveredo sieht eine Verlegung der Nationalstraße A13 aus dem Dorfbereich vor und umfasst drei Hauptabschnitte. Kernstück der Umfahrung Roveredo ist der 2.391 m lange, zweispurige Tunnel San Fedele, der im Gegenverkehr betrieben wird. Parallel zum Tunnel wird ein Sicherheitsstollen mit einem Ausbruchdurchmesser von 4 m erstellt. Dieser wird alle 300 m mit dem Tunnel verbunden.