z-logo
Premium
Palomino HRT – Exploration drillings in two geological formations
Author(s) -
Walter Andreas,
Guimarães Carlos,
Gerstner Reinhold
Publication year - 2012
Publication title -
geomechanics and tunnelling
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.317
H-Index - 18
eISSN - 1865-7389
pISSN - 1865-7362
DOI - 10.1002/geot.201200007
Subject(s) - overburden , geology , archaeology , excavation , groundwater , hydrology (agriculture) , geomorphology , geotechnical engineering , mining engineering , geography
Abstract The Palomino HPP, with an installed capacity of 80 MW, is under construction in the Central Mountains of the Dominican Republic. The geological investigations for the 13.53 km long headrace tunnel were highly restricted due to difficult access in the mountain areas, high tunnel overburden as well as precautionary environmental protections in the National Park José del Carmen Ramirez. With respect to the approximately 12.4 km long TBM drive an exploration programme was carried out during excavation, to detect fractured zones as well as the presence of pressurised groundwater in advance. Palomino HRT – Erkundungsbohrungen in zwei geologischen Gebirgsarten Im zentralen Bergland der Dominikanischen Republik wird das Wasserkraftwerk Palomino mit einer Nennleistung von 80 MW errichtet. Aufgrund der schwierigen Zugänglichkeit, der hohen Überlagerungen und der naturschutzbedingen Einschränkungen im Nationalpark José del Carmen Ramirez war die geologische Erkundung entlang des 13,53 km langen Druckstollens stark eingeschränkt. Für den etwa 12,4 km langen TBM‐Abschnitt wurde, um Störzonen oder das Antreffen druckhafter Gebirgswässer im Vortrieb vorab zu erkennen, ein ausführliches Vorauserkundungsprogram konzipiert.

This content is not available in your region!

Continue researching here.

Having issues? You can contact us here