z-logo
Premium
News: Geomechanics and Tunnelling 5/2011
Publication year - 2011
Publication title -
geomechanics and tunnelling
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.317
H-Index - 18
eISSN - 1865-7389
pISSN - 1865-7362
DOI - 10.1002/geot.201190042
Subject(s) - quantum tunnelling , geomechanics , railway tunnel , engineering , geology , humanities , geotechnical engineering , physics , structural engineering , art , condensed matter physics
Second bore of the Bosruck Tunnel broken through / Zweite Röhre Bosrucktunnel durchgeschlagen Breakthrough and first blast at the Brenner Base Tunnel / Durchstich und Anschlag beim Brenner Basistunnel Breakthrough in the Eierberge Tunnel / Durchschlag im Tunnel Eierberge PORR to construct two tunnels for Stuttgart 21 / PORR baut zwei Tunnel für Stuttgart 21 New large contracts for Strabag subsidiary / Neue Großaufträge für Strabag‐Töchter Tunnel boring machine for the Orlowski Tunnel achieves new world record / Tunnelbohrmaschine für Orlovskij‐Tunnel bringt neuen Weltrekord Limberg II starts full operation / Limberg II geht in den Vollbetrieb Gotthard Base Tunnel should open in 2016 / Gotthard‐Basistunnel soll 2016 in Betrieb gehen Call for papers – Topics for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling” Underground line 1 in Panama / U‐Bahnlinie 1 in Panama

This content is not available in your region!

Continue researching here.

Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom