The eastern autobahn ring around Biel required the construction of two two‐bore tunnels in difficult and changeable geology. All four tunnel bores were driven by an earth pressure machine with a diameter of 12.6 m. The excavated material was cleared, also while working in open mode, by a screw conveyor which required correspondingly large dimensions and a powerful drive, see pages 699–710 (Photo: ATUBO). Bei der Erstellung des Ostastes der Autobahnumfahrung Biel sind zwei zweiröhrige Tunnel in schwieriger, wechselnder Geologie zu realisieren. Alle vier Tunnelröhren werden mit nur einer Erddruckmaschine (Durchmesser 12, 6 m) aufgefahren. Auch im Open Mode erfolgt die Förderung des abgebauten Materials mit einer Förderschnecke, die entsprechend groß dimensioniert ist und über einen leistungsstarken Antrieb verfügt, siehe Seiten 699–710 (Foto: ATUBO).