z-logo
open-access-imgOpen Access
A new simultaneous placement of distributed generation and demand response resources to determine virtual power plant
Author(s) -
Nosratabadi Seyyed Mostafa,
Hooshmand RahmatAllah,
Gholipour Eskandar,
Parastegari Moein
Publication year - 2016
Publication title -
international transactions on electrical energy systems
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.428
H-Index - 42
ISSN - 2050-7038
DOI - 10.1002/etep.2128
Subject(s) - virtual power plant , particle swarm optimization , distributed generation , demand response , power station , scheduling (production processes) , mathematical optimization , computer science , reliability engineering , electric power system , power (physics) , engineering , electricity , renewable energy , electrical engineering , mathematics , physics , quantum mechanics
Summary Virtual power plant (VPP) is combining different types of generations and interruptible loads to be able to contribute to the market as a power plant with a significant output. In other words, different power generations are combined in a complementary manner to form a defined generation and a demand profile. Because the most important elements of these operators are distributed generation (DG) units and demand response loads (DRLs), the determination of optimal location, capacity, type, as well as the installation time of DGs, DRLs participation size, and place in the distribution system are the most important challenges of operators. In this paper, the formulation of optimal placement of DG resources and DRLs is presented and solved simultaneously in a distribution system to determine the optimal VPP. For this purpose, the concepts of commercial virtual power plant and technical virtual power plant are introduced first, and then the optimal VPP, which can send its energy bids as a short‐term and long‐term power scheduling to the power market, is determined. Here, commercial virtual power plant and technical virtual power plant will act jointly as commercial–technical virtual power plant to extract the results of the proposed optimization procedure. In this paper, the binary particle swarm optimization algorithm is used to solve the optimization problem in the distribution system. The proposed method is applied to the IEEE 33‐bus distribution test network, and the results confirm the effectiveness of the proposed method. Copyright © 2015 John Wiley & Sons, Ltd.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here