Subject(s) - air preheater , boiler (water heating) , power station , load following power plant , engineering , combined cycle , turbine , thermal power station , electricity generation , piping , automotive engineering , steam turbine , base load power plant , process engineering , environmental science , power (physics) , mechanical engineering , electrical engineering , waste management , renewable energy , distributed generation , physics , quantum mechanics
The load‐shedding scenario describes an unscheduled load reduction in a power plant so that it produces only the electricity that is needed by the plant itself. The reason for such a scenario is a collapse of power supply in the transmission network. In the subsequent restoration of the electrical supply, different options are distinguished. An essential part of each option is island operating or black start capable thermal power plants. The load‐shedding scenario is complex and multilayered. If process steam is also decoupled during the load shedding, high exhaust steam temperatures in the turbine stages can lead to plant shutdown. In addition, component damage can be expected in thick‐walled components due to high temperature and pressure amplitudes. Thus, it can be shown in this paper that the lifetime losses are highest at the high‐pressure preheater 6 and at the deheater and that the process heat coupling cannot be operated with constant mass flow under all circumstances. In order to investigate these issues, a detailed model of a lignite power plant has been created, which was developed in Modelica for simulating and comparing scenarios for a variety of applications. The model comprises the entire water‐steam cycle including turbines, preheaters and pumps, as well as a very detailed boiler model including the air supply, coal mills, heating surfaces, and piping. Furthermore, the power plants' control system has been implemented in a very precise way. In addition, the study involves a calculation of lifetime consumption for specific components to evaluate the effects. In summary, it can be stated that this study examines the thermodynamic aspects during a load‐shedding scenario for the first time. It focuses on processes within the power plant and thus differs significantly from other studies on this topic, which approach the issue from the electrical grid side.