Open Access
Optimal operation of the combined heat and power system equipped with power‐to‐heat devices for the improvement of wind energy utilization
Author(s) -
Yu Yanjuan,
Chen Hongkun,
Chen Lei,
Chen Cheng,
Wu Jun
Publication year - 2019
Publication title -
energy science and engineering
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.638
H-Index - 29
ISSN - 2050-0505
DOI - 10.1002/ese3.375
Subject(s) - heat pump , wind power , electric power system , power (physics) , computer science , process engineering , automotive engineering , engineering , mechanical engineering , electrical engineering , quantum mechanics , physics , heat exchanger
Abstract The combined heat and power system (CHPS) is one important type of the integrated energy system in Northern China. Compared with the independently operated power system, the combined heat and power system (CHPS) has a great potential to improve the utilization of wind energy in virtue of the energy storage of the heating system and power‐to‐heat (P2H) devices. This paper studies the optimal operation of the CHPS equipped with the electric boiler (EB) and heat pump (HP). Comprehensive factors are considered, including P2H conversion, the thermal inertia of district heating network (DHN) and buildings, and adjustable heat loads. An equivalent model of the heating system is developed to express the direct mathematical relations between the heat source and heat loads. Redundant details of the DHN are simplified to reduce the complexity of the optimization problem. Furthermore, a self‐repair method incorporated with the real‐coded genetic algorithm (RCGA) is proposed to efficiently handle the nonlinear constraints. The effectiveness of the solving method is verified in case studies. The impacts of the EB and the HP on the CHPS are compared in details. The results show that the HP offers better performance than the EB on coal saving and improving wind power integration.