Premium
Approach and structure of stabilizing control system preventing an extension of synchronism loss
Author(s) -
Ōura Yoshifumi,
Suzuki Mamoru,
Yanagihashi Ken,
Sato Masihiro,
Tsukui Ryouichi,
Matsushima Tetsuro,
Omata Kazuya
Publication year - 1993
Publication title -
electrical engineering in japan
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.136
H-Index - 28
eISSN - 1520-6416
pISSN - 0424-7760
DOI - 10.1002/eej.4391130706
Subject(s) - synchronism , fault (geology) , generator (circuit theory) , control theory (sociology) , power (physics) , electric power system , swing , electric power transmission , line (geometry) , transmission line , tie line , computer science , engineering , voltage , electrical engineering , control (management) , mathematics , mechanical engineering , physics , geometry , quantum mechanics , artificial intelligence , seismology , geology
Recently, large‐capacity power stations have been built far from load centers with long‐distance transmission lines. Therefore, if a fault occurs at the line, generators in the large‐capacity power station may lose synchronism from the remaining generators [1, 3]. To prevent an extension of loss of synchronism to other generators, fast shedding of some generators is an effective measure. The following methods have been proposed so far: A method [3] based on energy function approach; and a method [2] which estimates and predicts the relative swing among generators using data measured on‐line at each generator and proposes shedding some generators for stabilization. This method requires a large communication network for an exchange of data between power stations. This paper presents a new stabilizing method and a newly developed stabilizing control system which does not require a large communication network because it utilizes generator output, voltage and current measured on‐line in the vicinity of the large‐capacity power station. Using these measured data, the system estimates and predicts the relative swing between generators in the large‐capacity power station and the remaining generators. Finally, the number of generators to be shed for stabilization is decided and shedding is performed. Configuration and characteristics of the developed stabilizing control system are shown. The validity of this method is confirmed by simulation and testing using an artificial power system.