Premium
Abnahme und Überwachung der Anlagen
Author(s) -
Grein Wilhelm,
Braubach HansOtto
Publication year - 1980
Publication title -
chemie ingenieur technik
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.365
H-Index - 36
eISSN - 1522-2640
pISSN - 0009-286X
DOI - 10.1002/cite.330520806
Subject(s) - principal (computer security) , acceptance testing , legislation , engineering , chemical plant , risk analysis (engineering) , project commissioning , systems engineering , computer science , business , environmental engineering , computer security , political science , software engineering , publishing , law
Acceptance testing and surveillance of plant . Existing legislation require acceptance testing of the principal components of a chemical plant prior to its commissioning. As shown for a pressure vessel, this testing of a large chemical plant can only be performed effectively if the necessary concepts have been developed and the data required have been collected during the planning and construction stage. It is not sufficent to consider the components individually. Their incorporation into the plant and their mutal interaction are just as important. Acceptance testing must be preceded by a consideration of the overall safety of the plant. This does not require any new regulations. Regular surveillance ensures that the established safety level is maintained. Many surveillance measures are already stipulated during acceptance testing.