z-logo
Premium
Makespan minimization in the two‐machine flowshop batch scheduling problem
Author(s) -
Cheng T.C.E.,
Lin B.M.T.,
Toker A.
Publication year - 2000
Publication title -
naval research logistics (nrl)
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.665
H-Index - 68
eISSN - 1520-6750
pISSN - 0894-069X
DOI - 10.1002/(sici)1520-6750(200003)47:2<128::aid-nav4>3.0.co;2-#
Subject(s) - job shop scheduling , minification , computer science , scheduling (production processes) , mathematical optimization , flow shop scheduling , mathematics , schedule , operating system
In this paper we consider a practical scheduling problem commonly arising from batch production in a flexible manufacturing environment. Different part‐types are to be produced in a flexible manufacturing cell organized into a two‐stage production line. The jobs are processed in batches on the first machine, and the completion time of a job is defined as the completion time of the batch containing it. When processing of all jobs in a batch is completed on the first machine, the whole batch of jobs is transferred intact to the second machine. A constant setup time is incurred whenever a batch is formed on any machine. The tradeoff between the setup times and batch processing times gives rise to the batch composition decision. The problem is to find the optimal batch composition and the optimal schedule of the batches so that the makespan is minimized. The problem is shown to be strongly NP‐hard. We identify some special cases by introducing their corresponding solution methods. Heuristic algorithms are also proposed to derive approximate solutions. We conduct computational experiments to study the effectiveness of the proposed heuristics. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 128–144, 2000

This content is not available in your region!

Continue researching here.

Having issues? You can contact us here