z-logo
open-access-imgOpen Access
Behavior of double deck tunnel due to feature change and variation of ground water table
Author(s) -
No-Hyeon Park,
Ho-Jong Kim,
Jong-Ho Shin
Publication year - 2016
Publication title -
journal of korean tunnelling and underground space association
Language(s) - English
Resource type - Journals
eISSN - 2287-4747
pISSN - 2233-8292
DOI - 10.9711/ktaj.2016.18.6.581
Subject(s) - water table , groundwater , geotechnical engineering , table (database) , groundwater flow , deck , rainwater harvesting , environmental science , flow (mathematics) , hydrology (agriculture) , engineering , structural engineering , aquifer , computer science , ecology , biology , data mining , geometry , mathematics
Several attempts to construct multi-purpose tunnel for both road and waterway have been made. The multi-purpose tunnel is mainly used as a road tunnel, however it is transferred to waterway to control flood during rainy season. The planning of the multi-purpose tunnel is recognized as cost-effective way of infrastructure construction. In case of the multi-purpose tunnel constructed beneath groundwater table, seasonal fluctuation of groundwater table and repeated flow in the tunnel may cause long-term deterioration of the tunnel system. In this study, the behavior of multi-purpose tunnel in view of groundwater table or flow in the tunnel is investigated using model test and numerical modeling method. The results have shown that rising of groundwater table caused buoyant force to the tunnel and the fluctuation of rainwater in the tunnel generated loosening of surrounding ground. It is recommended to evaluate the effect of the long-term water pressure variation in the design of a multi-purpose tunnel.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom