z-logo
open-access-imgOpen Access
A study on key factors of ground surface settlement due to shield TBM excavation using 3-dimension numerical analysis
Author(s) -
Gychan Jun,
Donghyun Kim
Publication year - 2015
Publication title -
journal of korean tunnelling and underground space association
Language(s) - English
Resource type - Journals
eISSN - 2287-4747
pISSN - 2233-8292
DOI - 10.9711/ktaj.2015.17.3.305
Subject(s) - shield , excavation , settlement (finance) , geotechnical engineering , numerical analysis , finite element method , geology , lateral earth pressure , key (lock) , computer simulation , mining engineering , engineering , structural engineering , mathematics , computer science , petrology , mathematical analysis , computer security , world wide web , payment , simulation
This paper is to perform 3-dimensional numerical analysis considering face pressure, backfill pressure, excavation length, soil model and element size for selecting key factors of ground surface settlement due to shield TBM advancement. According to the numerical analysis results, backfill pressure and soil model are governing factors inducing ground surface settlement. To complement this study, the ground conditions and characteristics of the boring machine will be considered using numerical analysis.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom