Risk Assessment of a Post-Combustion and Amine-Based CO2 Capture Ready Process
Author(s) -
Alicja Krzemień,
Angelika WięckolRyk,
Adam Duda,
A. Koteras
Publication year - 2013
Publication title -
journal of sustainable mining
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.623
H-Index - 17
eISSN - 2543-4950
pISSN - 2300-3960
DOI - 10.7424/jsm130404
Subject(s) - hazard and operability study , operability , process (computing) , power station , carbon capture and storage (timeline) , hazard , engineering , risk analysis (engineering) , fossil fuel , systems engineering , waste management , process engineering , computer science , reliability engineering , business , climate change , ecology , chemistry , electrical engineering , organic chemistry , biology , operating system
CO2 Capture Ready Process, as a part of Carbon Capture and Storage (CCS) technology, is a response to international political pressure and the priority of the European Commission to reduce anthropogenic CO2 emissions since it is connected with concerns regarding global warming. This is currently considered as an option for lessing CO2 emissions into the atmosphere. Many laboratory experiments, as well as pilot projects, have been carried out using different capture systems, but until now no experience from the one-to-one size operational installation has been gained. The energy industry must meet several challenges associated with the start-up of the new full-scale project. This paper investigates the problems that can occur while linking a new technology like the CO2 Capture Ready Process to a working fossil fuel power plant. A Hazard and Operability study (HAZOP) has been used, as it is a structured and systematic examination of a planned or existing process or operation, in order to identify and evaluate problems that may represent risks to personnel or equipment. A case study of a post-combustion CO2 capture system with an aqueous monoethanolamine as a solvent is presented, as it is the most likely system to be used in Polish power plants. Basic problems in the analysis as well as the parameters that should be considered to determine vulnerabilities of the process were successfully identified. Gaining experience about the installation’s behaviour while connected to the existing equipment of any power plant is critical for future CCS projects
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom