BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge
Author(s) -
Kyoung-Sik Chun,
WonTae Park
Publication year - 2015
Publication title -
journal of the korea academia-industrial cooperation society
Language(s) - English
Resource type - Journals
eISSN - 2288-4688
pISSN - 1975-4701
DOI - 10.5762/kais.2015.16.10.7204
Subject(s) - bridge (graph theory) , wizard , bidding , cost estimate , process (computing) , computer science , conceptual design , engineering , construction engineering , systems engineering , mechanical engineering , medicine , marketing , business , operating system , world wide web
This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom