Perencanaan Hidrolis Pintu Pada Bangunan Pengambilan Air (Intake)
Author(s) -
Binsar Silitonga,
Hendry Hendry
Publication year - 2018
Publication title -
jurnal rekayasa konstruksi mekanika sipil (jrkms)
Language(s) - English
Resource type - Journals
eISSN - 2715-1581
pISSN - 2614-5707
DOI - 10.54367/jrkms.v1i2.282
Subject(s) - weir , water intake , hydrology (agriculture) , environmental science , civil engineering , water resource management , environmental engineering , engineering , geotechnical engineering , geography , cartography
The planning process of an intake water building must be conducted properly, such by considering several aspects namely topography, hydro-climatology, and also hydraulic condition of existing stream. In the planning of intake water building, the dimensions of water gate are based on the existing weir building. The Existing Dam building in this study is Sei Bingei weir. This weir was constructed to detain the flow of Bingei River. The weir is used to collect water to fill the demand of water company (PAM) Tirta Sari Binjai City.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom