z-logo
open-access-imgOpen Access
Lug Arrangement and Dynamic Analysis of Lifting Simulation for Underwater Installation of Structure in Asymmetric Position
Author(s) -
Ara Jo,
Kwang-Phil Park,
Hyunjin Lee
Publication year - 2015
Publication title -
journal of the society of naval architects of korea
Language(s) - English
Resource type - Journals
eISSN - 2287-7355
pISSN - 1225-1143
DOI - 10.3744/snak.2015.52.4.283
Subject(s) - turret , position (finance) , mooring , engineering , cable gland , marine engineering , underwater , structural engineering , mechanical engineering , geology , oceanography , finance , economics
RGT(Riser Guide Tube) is a part of mooring on the bottom of a turret system to be connected with a production riser, and DBSC(Diverless Bend Stiffener Connector) is a latching component between them. In this paper, appropriate lug arrangement is decided mathematically for the case that a DBSC is lifted and installed on a RGT under the water while FPSO is under construction. Considering asymmetric arrangement & position of RGT and initial lug position, additional lug positions are determined by using an optimization method. The modified installation scheme with new lug points is investigated with a lifting simulation system, SIMSON. The simulation result shows that the installation of DBSC on RGT under the given conditions is quite feasible; therefore the mathematical method is proven to be appropriate.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom