Optimasi Kapasitas Produksi Assembly Line LED Downlight PT. DEF
Author(s) -
Ririn Desfiasri Desfiasr,
Andira Andira
Publication year - 2016
Language(s) - English
DOI - 10.33021/jie.v1i1.24
PT. DEF is a manufacturing company that produces lighting fixture. Light Emitting Diode (LED) down-light is one of the company flagship products. With the new type (LGB72316 LE1 and LGB72317 LE1) and the company's policy not to add man-power in production units lead automatically in addition of work hours on the production schedule that’s resulting in increased overtime. After a series of data collection and testing, as well as the determination of standard time on the assembly line work related, research shows that low line efficiency (66.55%) and the balance delay is high (33.45%). This is an indication of poor performance related on the assembly line. Line balancing would be an alternative problem solving tools to overcome these problems. This study tried to draft a new balancing method Helgeson-Birnei, Moodie Young and Kilbridge-Wester Heuristics. Of a series of procedures that have been performed, the method Kilbridge-Wester Heuristics showed the best results. The method is able to improve performance by reducing cycle time, product of 35.17 seconds / products became 32.88 seconds / products and generate 6 work stations with 6 operators, line efficiency 94.91%, balance delay 5.09%, smoothness index of 6,224 and labor cost saving of Rp 7,215,011.27 per month.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom