z-logo
open-access-imgOpen Access
PENERAPAN ALAT BANTU LIFTER BRIDGE UNTUK MENGURANGI WAKTU DAN JARAK TEMPUH DALAM PEMINDAHAN BARANG SETENGAH JADI DI PT. TMMIN
Author(s) -
Yulvani Anggi Rahmawati
Publication year - 2021
Publication title -
jurnal teknika
Language(s) - English
Resource type - Journals
eISSN - 2620-4770
pISSN - 2085-0859
DOI - 10.30736/jt.v13i2.659
Subject(s) - workload , transport engineering , bridge (graph theory) , business , computer science , operations management , engineering , operating system , medicine
PT TMMIN's logistics department is responsible for the smooth supply of component parts to the production line. In the delivery of parts, there is a problem, namely traffic disturbances in the PAD supply with the supply ip module. Both supplies cannot be in the same area due to insufficient area space. This situation causes the operator's workload to be a waste of steps and time. To overcome this problem, it is proposed to replace the part delivery tool that is currently used with a push dolly with a karakuri lifter bridge. Tool changes are carried out with 3M+1E aspects, namely method, material, man and environment. Change of equipment can affect factors such as no traffic disruptions with other supplies, reduction of SPS area, reduction of SPS distance to pp module and increasing company productivity efficiency.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom