z-logo
open-access-imgOpen Access
Logistics Planning and Visualization of Modular Integrated Construction Projects Based on BIM-GIS Integration and Vehicle Routing Algorithm
Author(s) -
Sanyuan Niu,
Yi Yang,
Wei Pan
Publication year - 2019
Publication title -
modular and offsite construction (moc) summit proceedings
Language(s) - English
Resource type - Journals
ISSN - 2562-5438
DOI - 10.29173/mocs141
Subject(s) - visualization , modular design , vehicle routing problem , computer science , building information modeling , integrated logistics support , systems engineering , routing (electronic design automation) , transport engineering , operations research , process management , engineering , operations management , data mining , embedded system , scheduling (production processes) , operating system
Logistics planning is a critical part of developing supply chain for modular integrated construction (MiC) projects in Hong Kong where high-rise, high density and hilly landscape is the norm. It is important to minimize the total logistics and to guarantee timely delivery of modules, especially for several MiC projects being constructed during the same period. Nevertheless, there is a significant lack of studies on logistics planning, optimization and visualization for MiC projects. The aim of this paper is to establish an integrated MiC logistics planning and visualization platform, which is grounded on the integration of building information modeling (BIM), geographical information system (GIS) and vehicle routing problem (VRP) algorithm. The framework is then presented and evaluated using a case study to identify optimal logistics scenario of trailer routes to meet the installation time window of MiC projects in Hong Kong. The paper finds that the proposed platform has the ability to make optimized logistics scenario for MiC projects, and to visualize the logistics scenario in a 3-dimentional interactive environment. Future study will focus on adopting flexible control strategies and including more decision-making criteria of logistics planning in MiC projects such as road width limitation, travel speed and different module types

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom