z-logo
open-access-imgOpen Access
Peak Load Prediction Using Fuzzy Logic For The 150 kV Sulselrabar System
Author(s) -
Muhammad Ruswandi Djalal,
Andareas Pangkung,
Sog Sog,
Apollo Apollo
Publication year - 2018
Publication title -
journal of information technology and computer science
Language(s) - English
Resource type - Journals
eISSN - 2540-9824
pISSN - 2540-9433
DOI - 10.25126/jitecs.20183139
Subject(s) - fuzzy logic , matlab , computer science , data processing , software , fuzzy control system , real time computing , data mining , artificial intelligence , database , programming language , operating system
Prediction of electrical load on 150 kV Sulselrabar electrical system, analyzed using approach at night peak load using Fuzzy Logic based intelligent method. The peak load characteristics are certainly different from the load in normal time, therefore a special approach is needed to predict the peak night load. As input data will be used data of night peak load in 2010 until 2015, on the same day and date, each 4 days before day-H or day date which will be predicted load. For the data processing stage is divided into several stages, namely pre-processing, processing, and post-processing. The load data processing follows several procedures, ie computing WDmax, LDmax, TLDmax and VLDmax each year. Data processing is processed using excel software and then using Matlab software to run Fuzzy Logic. From the analysis results obtained, Error Prediction The peak evening load is very small that is equal to -0.070033687%. As comparison data used actual day-H data is April 2016. The graph of analysis result also shown in this paper. Keywords– Fuzzy Logic Control, Load Forecasting, Error, VLDmax

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom