z-logo
open-access-imgOpen Access
An Elimination Type of Pokayoke- A Game Changer Tool in the Propeller Shaft Assembly
Author(s) -
Nilesh H. Khandare et al. Nilesh H. Khandare et al.
Publication year - 2018
Publication title -
international journal of mechanical and production engineering research and development
Language(s) - English
Resource type - Journals
eISSN - 2249-6890
pISSN - 2249-8001
DOI - 10.24247/ijmperdoct201825
Subject(s) - propeller , marine engineering , type (biology) , computer science , engineering , geology , paleontology
Monitoring the Industrial OEE (Overall Equipment Effec tiveness) [3],[4]is now a day’s a very essential concern for optimizing the use of the resources and tracking the efficiency of the manufacturing organ ization. To produce the goods with no errors is really a challen ge in this era. Pokayoke [1] is a Japanese term; whi ch means “Mistake Proofing” and most widely used in automoti ve industries to eliminate defect and possibility o f producing the defective parts. “Elimination” is one of the type of the Pokayoke system; which is generally adopted to eliminate the possibility of the chance error during the operatio n. Thistool is used in Propeller Shaft manufacturin g organization; especially in Propeller Shaft assembly; resulting i n the productivity optimization which is achieved mo re than 50%, another breakthrough is 20% saving in “rework” parts and 30% “Not ok” parts are saved out of the total propeller shafts considered for trial.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom