z-logo
open-access-imgOpen Access
Separations P.E.S. report No. 11: Task 1, activation study, RMA Line 234-5 Building
Author(s) -
B.M. Stark
Publication year - 1952
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/96917
Subject(s) - task (project management) , process (computing) , computer science , line (geometry) , engineering drawing , database , human–computer interaction , engineering , systems engineering , operating system , mathematics , geometry
It was the purpose of this study to determine whether it will be more desirable when activatiing Task I of the RMA. Line to revise the existing remotely operated equipment or to remove existing equipment and install a manually operated facility. It was also the purpose of this study to provide sketches and cost estimates for each alternative which could be used as a guide for preparation of a Project Proposal. At present, the process to be used in Task I has not been established. This study, therefore, necessarily covers only processes similar to those for which Task I was originally designed. Information received from the Process Unit indicates adoption of such a process is probable

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom