LABAN containment data report
Author(s) -
T. Stubbs,
R. Heinle
Publication year - 1995
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/95249
Subject(s) - alluvium , containment (computer programming) , geology , chimney (locomotive) , test site , seismology , event (particle physics) , hydrology (agriculture) , mining engineering , archaeology , geomorphology , geotechnical engineering , geography , physics , inlet , programming language , quantum mechanics , computer science
The LABAN event was detonated in hole U2ff of the Nevada Test Site. The device had a depth-of-burial of 326 m in the alluvium of Area 4, about 240 m above the standing water level (SWL). Stemming of the 2.44 m diameter emplacement hole followed the plan. A log of the stemming operations was maintained by Holmes and Narver. Detonation time was 06:33 PDT on August 3, 1983. About 75 minutes later the chimney began collapsing to the surface. A major collapse event occurred 5 minutes later with episodes continuing for the next 20 minutes. No radiation arrivals were detected in the emplacement hole at depths less than 106 m and the LABAN containment was considered successful
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom