z-logo
open-access-imgOpen Access
MHD advanced power train. Phase 1, Final report: Volume 1, Executive summary
Author(s) -
Allan R. Jones
Publication year - 1985
Language(s) - English
Resource type - Reports
DOI - 10.2172/93532
Subject(s) - train , plan (archaeology) , power (physics) , schedule , engineering , scale (ratio) , systems engineering , industrial engineering , volume (thermodynamics) , computer science , electrical engineering , physics , geology , operating system , paleontology , cartography , quantum mechanics , geography
The Phase I objective of defining a plan for the development program that will provide qualification of the engineering data base for MHD power trains for MHD/steam plants with 200 MW(e) capacity, has been achieved. A program has been defined for engineering development of components, scale-up of power train components to reach 200 MW(e), integration of components into proof-of-concept power train systems at two logical ratings, and integration of power train system into the total plant at the larger rating. There is no requirement for scientific breakthrough. The plan will produce technical success in the shortest schedule and at lowest cost; it identifies the required management and engineering tools and expertise

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here